Dana Library Transformation Completion

Posted on February 17, 2022 by Elsa Alves

As you enter the Dana Library entrance across from the Paul Robeson Campus Center, the lobby reaches up to hold spherical lights. Ahead is a wide alcove filled with natural light that is the site of the Library CafĂ©. To… Continue Reading →

Photos

Addition Update

Posted on November 24, 2020 by Elsa Alves

Hi All! For today’s update, we see that the stairwell wallpaper is almost completely installed. The cool light fixtures are hanging in the new lobby. And check out the light fixtures on the stairwell walls; it changes colors! Stay safe… Continue Reading →

Updates Entrance, lobby, stairwell, Third Floor

Dana at night…

Posted on November 11, 2020 by Elsa Alves

Now without the tall fence you can see the progress of the new stairwell.

Photos exterior, stairwell

Exterior Update

Posted on November 10, 2020 by Elsa Alves

Hi Everyone! In today’s exciting update, we see the old chain-link fencing has been replaced by an orange construction fence. The new sidewalk to the new entrance is in place. They also started to put down the red pavers that… Continue Reading →

Updates exterior, sidewalk

Sneak Peek…

Posted on October 28, 2020 by Elsa Alves

Hello All! In the last few weeks, we received the furniture for what will be the new third-floor open study space. Take a look at all the cool seating!!! Stay safe everyone.

Updates New Furniture, Third Floor

September 25, 2020 Update

Posted on September 25, 2020 by Elsa Alves

Hello All! Welcome Back! Hope everyone is safe and well! Below are some pictures of the construction progress. It looks amazing! Check out the stainless steel shingles (they resemble dragon scales). You will find them inside the new addition as… Continue Reading →

Photos, Updates elevator, fourth floor, outside, Third Floor

June 4, 2020 Update

Posted on June 4, 2020 by Elsa Alves

Outside Progress

Photos, Updates addition, outside, updates

May 12, 2020 Outside Progress

Posted on May 15, 2020 by Elsa Alves

Happy Friday! The outside is really starting to take shape. The stairwell sits inside the tall structure and behind it (not visible) is the elevator shaft. Stay Safe!

Photos, Updates Dana Renovation, Entrance, stairwell

May 1, 2020 Update Pt2

Posted on May 7, 2020 by Elsa Alves

This video is a glimpse (from the 2nd floor) to the frame for new glass wall that will enclose the new stairwell and elevator. And if you look close, the new entry door makes an appearance :). Stay safe!

Updates Curtainwall, Entrance, second floor

May 1st 2020 Update

Posted on May 6, 2020 by Elsa Alves

Hey Everyone! Hope you all are safe and well! Check out this video of the current progress. It was recorded from the new third floor landing, which shows the new stairwell (albeit a skeleton) and the elevator shaft (incomplete). The… Continue Reading →

Uncategorized elevator, stairwell, Third Floor

Post navigation

Older Articles

Recent Posts

  • Dana Library Transformation Completion
  • Addition Update
  • Dana at night…
  • Exterior Update
  • Sneak Peek…

Archives

  • February 2022
  • November 2020
  • October 2020
  • September 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • December 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019

Categories

  • Photos
  • Renderings
  • Uncategorized
  • Updates

Email Updates

* = required field

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
© 2022 Dana Transformation Project. All rights reserved.
Hiero by aThemes